Wolun Electric
Home Solutions About Us News Contact Us
Wolun Electric Fangte Amusement Park Charging Station Case
2026-10-10
Solutions
21

Zigong Fantawild Dinosaur Kingdom Underground Parking Lot Charging Station

Project Overview
微信图片_20240123163850_副本.jpg

Wollen Electric provides EPC integrated charging station construction for the underground parking lot of Zigong Fantawild Dinosaur Kingdom. The station is equipped with 32 DC fast charging guns and 16 AC slow charging guns, using Wollen 480kW flexible charging stacks to meet the charging needs of self-driving tourists.

Project Challenges
微信图片_20240123163759_副本.jpg

The scenic area experiences significant tidal fluctuations in visitor flow during holidays; the underground garage has high requirements for fire protection and electrical safety; visitor operation must be simple, and station operation and maintenance pressure is high.

Solution
微信图片_20240123163846_副本.jpg

Adopt a 480kW flexible power pool charging stack, with dynamic power allocation, to increase the number of guns under limited power distribution capacity and reduce power distribution investment. Equipped with the Wollen Cloud smart platform, QR code charging, remote monitoring and alarm, and equipment meets underground garage fire protection and safety regulations.

Project Value
微信图片_20240123163837_副本.jpg

Complete the new energy charging supporting facilities for the scenic area's underground garage, alleviate visitors' charging anxiety; the flexible solution adapts to holiday peak loads; the combination of fast and slow charging improves parking space utilization, remote operation and maintenance saves effort, achieving sustained operational revenue and creating a benchmark for cultural tourism charging in southern Sichuan.