Wolun Electric
Home Solutions About Us News Contact Us
City-level dedicated bus charging station case
2026-09-17
Solutions
454

City-Level Dedicated Bus Charging Station Overall Solution

For city bus groups, we provide an integrated solution covering planning, construction, equipment supply, platform supervision, and operation & maintenance.

Centralized Charging Batch Recharging Unified Supervision Full-Area O&M

74+ Total Stations 3 Cities Largest Single Station Area: 27,000㎡

Solution Overview

To address the needs of high-current centralized charging at bus depots, batch vehicle recharging, and unified O&M supervision, we build a city-level bus charging network overall solution, serving the electrification upgrade of urban public transport.

Integrated Implementation Capability for City Bus Charging Networks

Based on the operating rhythm of bus groups and depot construction conditions, we provide charging facility planning, high-power equipment deployment, power distribution system integration, monitoring platform access, and operation & maintenance services, forming a replicable city-level bus charging construction model.

Through multiple project practices, the solution has been validated in cities of different scales and various types of depots, demonstrating strong scalability.

Unified Planning: Starting from the city bus network, coordinate depot layout and construction pace.

Centralized Construction: Unified deployment of equipment, power distribution, and platform to shorten project implementation cycles.

Unified Operation & Centralized Monitoring: Unified access for multiple depots to improve O&M efficiency and management transparency.

Continuous O&M & Batch Recharging: Oriented to fleet operation scheduling to ensure batch recharging needs.

74+ Bus-Dedicated Charging Station Project Practices

Project Cases

We have built and operated multiple bus charging projects in Shunde, Guangzhou, Suzhou, etc., forming typical practices from large comprehensive depots to city-level supervision platforms.

Shunde Case

苏州公交 (1).png苏州公交 (2).png

Shunde Bus Charging Project

Completed unified planning, design, construction, O&M, and operation management of the district-wide bus charging network, building a full-area integrated bus charging infrastructure system to meet the centralized recharging needs of regional buses.

37 Bus-Dedicated Charging Stations Full-Area Planning, Construction, and O&M Integration

Guangzhou Case

顺德公交 (2).png顺德公交 (1).png

Guangzhou Bus Charging Project

Deployed ultra-large comprehensive charging stations, with the largest single station covering over 27,000㎡, capable of accommodating a large number of buses and social vehicles simultaneously, serving both bus operation recharging and public services.

4 Ultra-Large Comprehensive Charging Stations Largest Single Station: 27,000㎡

Suzhou Case

广州公交 (3).png广州公交 (1).png

Suzhou Bus Charging Project

Connected to the official Suzhou bus platform, achieving unified access and management of multiple charging stations, providing digital services such as equipment monitoring, data statistics, and O&M dispatch, improving the management efficiency of bus charging facilities.

33 Stations Connected to Supervision Platform Unified Digital Platform Supervision Data Overview

Project Data Overview

Based on multiple city projects, we have formed bus charging solution capabilities covering planning, construction, operation, and supervision.

37 Shunde Bus Charging Stations

4 Guangzhou Large Comprehensive Charging Stations

33 Suzhou Stations Connected to Supervision

Integrated Construction · O&M · Platform

Core Advantages

Core Advantages of the Solution

Focusing on the high-power, centralized, and platform-based needs in bus charging scenarios, we provide a more stable, efficient, and manageable solution.

⚡

Integrated Charging and Power Distribution

Charging piles and power distribution equipment are uniformly matched, adapting to high-power centralized charging conditions for buses, reducing system integration complexity.

🏙️

Full-Area Planning and Construction

Supports overall planning of city-level bus charging networks, enabling batch depot implementation and improving construction efficiency.

🔋

High-Power Batch Recharging

Oriented to bus fleet operation scheduling, providing overnight centralized batch recharging capability to ensure vehicle operation needs.

📊

Smart O&M Supervision

Unified platform access enables digital management of equipment monitoring, data statistics, and O&M dispatch, improving depot O&M efficiency.

Bus Charging Station Overall Solution Consultation

For more information on city-level bus charging network planning, depot construction, and operation management solutions, feel free to contact us.