沃轮电气
首页 解决方案 关于我们 新闻动态 联系我们
Highway Hub Supercharging
2026-07-15
沃轮电气
Solutions
325

Deploy 480–960 kW liquid-cooled DC superchargers and flexible charging stacks at highway hubs and urban fast-charging stations — up to 600 A per gun, 10–15 minutes to 80%, with the CSMS cloud platform delivering high uptime and dynamic power scheduling.